Customization: | Available |
---|---|
Certification: | ISO9001 |
Working Medium: | Freon |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item | Air Source Heat Pump Heat Air Blower | Air Source Heat Pump Unit |
Initial Investment | Low initial investment/eliminating the need for investmnet in circulating pumps, pipeline pumps, buffer tanks antifreeze, and terminal and pipeline fittings, heat preservation, as well as the installation cost of main unit and terminals. Additionally, there is no need to consider equipment antifreeze in winter. | High initial investment/pumps, water tanks, water softing equipment, pipelines, terminal equipment(radiator, fan coil unit, floor heating,etc.) are required, with complex structure, large land occupation and high investment. |
Energy Efficiency | Higher Energy Efficiency Ratio/ Air Source Heat Pump Heat Air Blowers directly blow out the heat or coolness of the refrigerant with a fan, directly delivering into the room. This eleminates the heat exchange between the refrigerant and water, as well as the heat exchange between water and terminal, thus reducing heat loss by skipping two heat exchange processes, resulting in a higher energy efficiency ratio. | Water is circulated by a pump through the main heat exchanger where heat exchange occurs. Water carries the heat produced by the main unit to the terminal equipment(radiator, fan coil unit, floor heating,etc.) for heat dissipation. This process involves two additional heat exchange steps, and the pump also sonsumes electricity, resulting in a lower heat exchange efficiency compared to air source heat pumps. |
Installation | Quick installation, a greenhouse of 1000 square meters can be installed in about one day. | The installation is comlex, and it takes about 7days to complete the installation of a greenhouse covering 1000 square meters. |
Failure Rate | There is only one main unit and one indoor unit, with a simple structure and low failure rate; if a piece of equipment fails to work, it does not affect the overall heating effect. | The system with pumps, pipelines,and terminal devices(radiator, fan coil unit, floor heating,etc.)is complex instructure and has a higher rate of failure; if the main unit fails, it will affect the heating effectof entire greenhouse. |
Antifreezing | Fluoride refrigerant system, not afraid of freezing. | The water system connot be powered off during winter and must operate at low temperatures; in the event of a power outage or if power needs to be cut off, it is necessary to drain the water promptly;if use antifreeze liquid is costly |